CODD reference data
Pick-ups
There are 40 PUs, dedicated to the CODD system, distributed around the
PS ring
in sections ending in 0, 3, 5, and 7. The electrodes are usually
installed between the pole pieces of a bending magnet, inside the pumping
manifold. (See, e.g.,
straight section 07)
References
-
J. Durand, J. Gonzalez, E. Schulte, M. Thivent, "New electrostatic pick-ups for the PS",
CERN/PS 88-42 (PA)
- "Specification for VME CODD Synchronization",
PS/BD/ Note 98-05 (Tech.)
- "An analysis of the CODD synchronization system"
August 2007, (Unpublished) (135kB)
- "The BLR & Gate generator", PS/BD/ Note 98-07 (Tech.)
- "The RFMUX and synchronizer", PS/BD/ Note 98-08 (Tech.)
- "The VMOD-TRX: A device for communicating with remote instrumentation",
PS/BD Note 96-02(Tech)
-
A proposal for new head-electronics for the PS
orbit measurement system
AB-Note-2003-057 (BDI) (183kB)
- "Measurement of the
Mean Radial Position of a lead ion beam in the CERN PS", PS/Note 96-23
-
"Specification of the Beam Position Measurement in the PS Machine", CERN-AB-NOTE-2004-059